News Article BTS industrial logistics Panattoni Europe Poland
by Property Forum | Industrial

Panattoni has completed the construction of the 8,260-square-metre logistics centre for DSV Solutions in Skarbimierz. The BTS facility is dedicated to handling the logistics of two Mondelēz International production plants in the vicinity – a chocolate factory and a gum & candy factory. The project was delivered at the Wałbrzych Special Economic Zone, and logistics operations at the facility started two weeks early – at the end of April.


The facility totals 8,260 sqm. The warehouse section (7,500 sqm) has been divided into 3 segments – the ambient zone is used to store packaging and production support materials, and the other two house a chocolate warehouse and gum and candy warehouse – supplied by the Mondelēz International factories operating nearby. The project complies with the requirements of HACCP, that is the Hazard Analysis and Critical Control Points System. It has additionally been furnished with a modern temperature control technology using pyrometry mapping – the system provides information on air temperature and humidity status. As a result, parameters can be controlled remotely, keeping the temperature at a stable level, between 10 and 20 degrees, and 65% air humidity. Moreover, for the purposes of the customer’s operations, the height of the hall has been increased up to 12 metres, and the floor can withstand loading up to 8 tons per square metre. The occupier will also be able to make use of 11 docks. Apart from the warehouse section, DSV Solutions has gained access to 225 sqm of office space.