Developers and heritage specialists in Slovakia are calling for reforms to the rules governing industrial protected sites, arguing that overly strict or inconsistent protections often leave historically significant buildings to deteriorate rather than be restored. The debate has come into focus around the former Matador factory complex in the Petržalka district of Bratislava, where a residential development is now under way on the site of a double-hall enamel works from 1905, designed by German architect Heinrich Zieger.
The site had been neglected for decades before a 2006 fire at a warehouse within the complex prompted calls for change. "It was precisely that fire that made us realise the absurdity of having a vast, deteriorating industrial complex right at the entrance to one of the largest housing estates in central Europe," said Oliver Kríž, project manager at Optimal Development, who initiated a petition to amend the local zoning plan for the area. The petition succeeded, allowing architects to begin planning the revitalisation of the site.
The original design for the Matadorka Living project, a cluster of five residential towers offering 267 flats, proposed retaining only fragments of the original enamel works. That approach alarmed heritage specialists, including Veronika Chládeková, an expert on industrial monuments. "When we saw the first concept, it quite literally raised us from our chairs. I have to say, though, that we managed to initiate a dialogue with the architects. Our aim is not to offend anyone, but to find a middle ground between both sets of interests," she explained.
The dialogue produced a significant revision. Matej Grébert of Compass architekti, the studio behind the redesign, said the team agreed to preserve the entire footprint of the original halls rather than isolated fragments. "We agreed that we would not keep only standalone fragments of the original halls, but that we would preserve the entire floor plan. Residents and visitors will immediately see that the buildings grow directly from the original hall," he said. The developer, Skanska, voluntarily chose this approach even though the Smaltovňa building was not granted national cultural monument status, which would have legally permitted demolition.
The compromise carries practical costs. Preserving the original concrete load-bearing columns and roof of the double hall will prevent the use of tower cranes in certain sections, complicating the movement of 23,000 cubic metres of concrete and 2,950 tonnes of steel. Heritage specialists point to wider systemic problems: Chládeková noted that of five buildings originally proposed for protection at the nearby Cvernovka complex, only one, the Pradiarňa building, received national monument status, with the others lost. "A further critical issue is parking. We are completely obsessed with parking, and the coefficients for spaces per flat mean you end up designing for cars rather than people. Slovak daylighting standards are similarly strict. What we lack is an intermediate level of protection that would safeguard buildings while allowing reconstruction after a dialogue about what is essential to preserve and what is not," she said.